Originally Posted by ATP Pilot
Does anyone know when the constructon on terms B/C @ DTW is going to be finished? The C terminal with the 1-area waiting "lounge" is horrible. I heard that they are making the C term more like the B term. Is this true?
Yes.
Should be another year from the looks of it. The B-terminal extention looks much closer to completion with the addition of ramps.