FlyerTalk Forums - View Single Post - UA's New EWR Terminal A: Security, How to get to, facilities, UC opened 28 June 2023
Old Sep 28, 2021, 7:31 am
  #41  
JimInOhio
 
Join Date: Jun 2014
Programs: UA MM
Posts: 4,125
Originally Posted by Xyzzy
The long term plan IIRC is at least to replace B in 10 or 15 years. Have a look at the map I posted - the blue bit is where the B replacement ges. I think that to build the new train the way it is proposed is completely stupid. A 2,200 foot walk / moving walkway leads one to ask, "What are they thinking?"
Here's a guess: The PA plans to tear down Terminal B and build a new one centered between the current (old) A and B. The proposed rail station 2 would become the stop for this new Terminal B and be nominally the same distance as between C and it's stop, a shorter walk than from the current B. Of course if the timeline resembles the temporary IAD C and D concourses, it won't be much of a plan.
JimInOhio is offline