Originally Posted by
PsiFighter37
Even with a United Club membership, A2 was a dump. The new terminal can't be any worse. That said, if they are planning to redevelop the entire airport, one terminal at a time, I sure hope they build a mass transit option that makes sense. The current AirTrain is dinky, is way too slow, but it gets the job done. If they build a replacement merely accounting for the new Terminal A, that is really asinine...unless they anticipate it will take decades to get other parts of the airport done. Not unlikely given the bureaucracy managing it!
The long term plan IIRC is at least to replace B in 10 or 15 years. Have a look at the map I posted - the blue bit is where the B replacement g

es. I think that to build the new train the way it is proposed is completely stupid. A 2,200 foot walk / moving walkway leads one to ask, "What are they thinking?"