<font face="Verdana, Arial, Helvetica, sans-serif" size="2">Originally posted by ozzie:
I still cannot work out why it takes so long to get from Blackfriars to London Bridge</font>
Don't the change the electricity supply from overhead to the 3rd rail somewhere around that area? Maybe that slows them up a bit to do the changeover.