FlyerTalk Forums - View Single Post - Thameslink to Gatwick?
View Single Post
Old Mar 15, 2003 | 11:35 am
  #10  
michaelblain
 
Join Date: Jan 2003
Location: London UK
Posts: 339
<font face="Verdana, Arial, Helvetica, sans-serif" size="2">Originally posted by ozzie:
I still cannot work out why it takes so long to get from Blackfriars to London Bridge</font>
Don't the change the electricity supply from overhead to the 3rd rail somewhere around that area? Maybe that slows them up a bit to do the changeover.
michaelblain is offline