FlyerTalk Forums - View Single Post - Plans to rebuild the UA concourse (C and D gates & UX terminal) at IAD / Dulles
Old Jul 14, 2021 | 7:53 am
  #68  
CLT
10 Countries Visited
20 Countries Visited
30 Countries Visited
10 Years on Site
 
Join Date: Aug 2011
Location: WAS/CLT/HKG
Programs: Former AA EXP (and former US CP) turned free agent
Posts: 812
Originally Posted by drewguy
Those "long range" plans aren't really genuine plans to build so much as they are concepts so they don't have to redo things, such as building a runway that would otherwise go through planned gates.

Of course, they look really silly now for building the C gate APM station where they did, given the continued use of the temporary C/D concourse. Some of these things would be fully depreciated before the "south terminal" would ever be built.
Indeed. The only part of this plan (other than Tier II) that will likely ever see the light of day is the APM line to the IAB.

I do wonder though why they decided to build the AeroTrain to C but decided against extending the line past the B Concourse station to the D gates.
CLT is offline