FlyerTalk Forums - View Single Post - UA's New EWR Terminal A: Security, How to get to, facilities, UC opened 28 June 2023
Old May 26, 2021 | 9:06 am
  #12  
8MiHi
20 Countries Visited
1M
All eyes on you!
5 Years on Site
 
Join Date: Jun 2016
Location: EWR
Programs: UA 1.75M , Platinum MM, UC Lifetime , HHonors Gold, Presidential Plus CC
Posts: 855
Originally Posted by EWR764
Yep, I don't think such a thing is even under remote consideration. A C-A airside walkway would probably be over a mile long. The current central terminal layout is much more conducive to a walkway, and even that was never developed.
I have done that walk on the land side and I have taken the bus. Both worked and both were less than ideal.
8MiHi is offline