Originally Posted by
moondog
-IMO, Maglev should be replaced by HSR, and simply connect PVG with SHA (several stops in town, as well)
The HSR line connecting SHA and PVG is already under construction, with a planned opening date of 2024. Unfortunately it doesn't go anywhere near the city centre.
https://zh.wikipedia.org/wiki/%E4%B8...BB%9C%E7%BA%BF