Originally Posted by
Yappofloyd
Construction progress as at 31 October:
5) BMA Gold Line: 98% - testing ongoing. Looking like a late Dec opening, perhaps 24-31 Dec?
Is the Gold Line the one that connects Prajadhipok MRT to Krung Thonburi BTS passing by ICONSIAM?