I see that American is grounding the 737 MAX until Sept 3.
https://www.theverge.com/2019/6/10/1...ghts-september
I'm scheduled to fly PE YHZ-CDG Aug 17 (Part of a multi-stop triangle YYC-YHZ-CDG-YYC trip). I feel I'll be flying all the way home to YYC before departing to CDG.
Last edited by cgyroof; Jun 12, 2019 at 8:04 am