Originally Posted by
brc01
I swung by today on a weekday and didn't see any work being done. The signage blocks virtually the whole upper floor. Looking through a small gap in the signage at the top of the escalators, it appears where the entrance will be is still completely gutted. At this point, I would say it's safe to say the lounge won't be opening this summer.
An airport project that doesn't complete on time? Shocking, absolutely shocking!
Regards