Originally Posted by
Speedbird676
The new DLM terminal opened last summer so BA have already operated to/from it.
The staff said something about the section of it having only been open about 2-3 months ago though, and that conversation was 2 days ago.
There is still a lot going on at the terminal as there were still bare walls onto which they were putting on some cladding.