So with B6 taking over T5-T7 as awarded by NYPA and BA having a lease on T7 until 2022, what are the odds that BA will shift to T8 and they will finish the original build out. I doubt the two wings off the Main Terminal close to the road will never get finished, but maybe the gates to the right of 16 will be added. What does the group think