FlyerTalk Forums - View Single Post - Typhoon Jebi floods KIX, breaks connecting bridge
Old Sep 11, 2018 | 2:24 pm
  #49  
trav25
 
Join Date: Feb 2004
Posts: 83
KIX issues

Due to fly in 9/27 if airport opens. If runways do open, I am reading there will still be a problem with the only bridge connecting KIX with mainland. Has anyone ever used the boats before? Do we have to make reservations for those ahead of time? Can a limo access the airport via the bridge? I’m hoping someone who lives near or knows will help. Thank you.
trav25 is offline