Originally Posted by
asphaltman
I’m on a flight now to DEN with a DEN based FA crew. Asked about catering and said kitchen is still partially down, and not expected to be fully up until at least until Jan. He said it was originally the bacteria issue, then got combined with the remodel project, and the recent thing they were told, some of the floor tile was installed wrong so water wouldn’t drain when washed, thus delaying operations further. What a mess...surely no discount on the United First product...lol.
Must be using the same general contractor to work on the Polaris Lounge remodeling.