FlyerTalk Forums - View Single Post - Cathay to move to Changi Terminal 4 in 2017
Old Oct 23, 2017, 2:48 am
  #149  
Kachjc
 
Join Date: Aug 2011
Posts: 1,421
Originally Posted by FlyPointyEnd
T4 is built on the site that used to be the LCC terminal. Although AirAsia and its affiliates will be operating from T4, it doesn't really necessarily mean that it is a LCC terminal.

KE is also moving to Terminal 4 together with CX. I think they will be the only 2 wide body operators from T4, while the rest will be narrow bodies.
with respect
CX failed
they could have go everything T4 offers and more had the been in the new T5 or negotiated to get into T3
Now it sits alongside Air Asia


the equivalent is SQ getting the North Satellite Concourse at HKG...

I do travel to and through Singapore and follow their airport development.

Anyone who does not think that T4 is the "crap airline" terminal is dreaming
Kachjc is offline