Originally Posted by
RttlnSnK
As a local, I would like to share some details on the Klang Valley metro system. The map shown above is kind of dated. Line number 4 and 5 is fully operational, while line number 9 is partially completed (From Sg. Buloh to Semantan). The full line will probably open by August. However, line 10 isn't even built yet.
Further update that the MRT from Sg. Buloh to Kajang (line 9 on the map) is now fully operational. Line 10 is still not built (and is different if you compare to the previous map posted). When connecting from KJ LRT (line 5 on the map) to MRT line 9, the Pasar Seni interchange is very quick and convenient; I did not try the KL Sentral/Muzium Negara connection but it appeared to involve a significant walk and perhaps exit/re-entry.