Originally Posted by
bgriff
The order was for 25 A350s, which is more aircraft than there have been in the 747 fleet any time recently. So the original order would seem to have called for some growth, and the later postponement would seem to indicate they're slowing down their plans for that growth.
Sure but when was the order actually placed?