Originally Posted by
stut
The shuttle from BHX to its railway station used to be a maglev (years before PVG). Now just cable hauled.
Apparently that system was so well built it rarely needed any kind of maintenance, and needed no replacement parts. When it came time to replace the system, the original company had long gone so they had to go with cable drawn system.