Originally Posted by
exwannabe
Thanks for the pdf.
Interesting that it pencilled in both an H an I concourse. Or possibly it is 3 locations for up to 2 new concourses? I like the idea of G being basically an F expansion though. That seems like a clean design from a user perspective.
The long, long-term plan if the airport still needs more space would then be to move TechOPS and expand the F/G/H/I concourses into full-size a la T-E. But moving TechOps will not be cheap.