Originally Posted by
drewguy
Is the idea here
Sort of; see posts
12-13 above. New security lines will be built next to the bridges that connect the terminal to the parking deck & Metro station.
The level with gates, concourses, and National Hall will be entirely within the security perimeter, and the top/ticketing level will be entirely outside security.