FlyerTalk Forums - View Single Post - How severe is overcrowded tube at London Bridge?
Old Apr 10, 2015 | 1:14 pm
  #9  
Efrem
FlyerTalk Evangelist
40 Countries Visited
3M
All eyes on you!
25 Years on Site
 
Join Date: May 1998
Location: Massachusetts, USA; AA 2.996MM & Plat Pro, DL 1MM, GM & Flying Colonel
Posts: 25,021
Originally Posted by stut
If the OP wishes to edit their post, it's not up to me to change that - there were details of the OP's stay in there that he may not wish to remain. However, I agree that this is useful information, given the ongoing engineering works at London Bridge.

What I can say is that the responses above refer to potential overcrowding on the Tube at London Bridge, as a result of the major engineering works that are currently underway as part of the Thameslink Programme, that severely restrict rail traffic through the mainline station. These are due to carry on until August 2006.

There have been instances of severe overcrowding in the mainline station:

...
Thanks! That's plenty for understanding the answers in context. I don't think anyone needs personal information about the OP or his/her travel plans. I don't have the slightest problem with redacting it, since it doesn't add value to the thread for anyone who comes along later.
Efrem is offline