Originally Posted by
anabolism
So no airside connection until everything is done in 2016 or so?
I initially thought that may be a possibility, but am thinking the text may relate only to the walkway above the mezzanine. The exterior part of the connector sits on the new luggage facility - I really cannot discern for sure.
A four month delay to the date as per the link in post 71 would indeed mean 2016.