Originally Posted by
joshwex90
The truth is, Terminal C, at least C3, isn't so bad. But the whole terminal should be overhauled, instead of more patchwork (like the hallway feels like).
I agree -- I rather take EWR Term C over LGA's CTB any day (minus LGA's UC). Term A is supposed to get a complete overhaul + expansion (forgot the timeline for that but the drawings/plans look impressive).