FlyerTalk Forums - View Single Post - NEXUS First Time Applications Information and Processing Timelines
Old Apr 9, 2014 | 2:29 pm
  #248  
uncomfortable
10 Years on Site
 
Join Date: Feb 2014
Posts: 22
Originally Posted by uncomfortable
An update from me too about the timing.

After being told that I had received a conditional approval on Jan 29, I finally received a letter on Feb 14 with the instructions to obtain an interview.

The first available appointment at Montreal airport was on May 7, so I tried for Champlain, NY, which had a few slots available for Feb 18, which was the following working day (since Feb 14 was a Friday and Feb 17 was President's Day).
I have had my interview and I am now waiting for the card.
When I thought I was near the finish line, I had to endure some more drama.
I was told my card was printed on Feb 21, but I hadn't received anything in the mail by Mar 22. So I called (again) CBP in Champlain, and they reprinted the card for me. I have subsequently realized that the system printed my address ignoring the second line, therefore omitting the apartment number, therefore the letter containing the first card was not delivered.

The new card was printed on Mar 27 and delivered by Apr 4.

I still have an open problem with regards to the use of GE kiosks. They do NOT accept my Italian passport (error message says that Canadian citizen member should use a Canadian passport, which I don't have since I am a Canadian LPR), and they do NOT accept the Canadian Permanent Resident Card. I have been suggested by CBP to use my NEXUS Card - I will try next time.
uncomfortable is offline