Originally Posted by halls120
IIRC the Silver line will end adjacent to the covered parking garage across from the Main Terminal, with elevator access to the underground walkway connecting it to the MT. It isn't that long of a walk, and there are already moveable sidewalks. They also run a shuttle bus from that parking garage to the MT.
That sounds correct, but for the end of "Phase 2" - which is just starting construction now, and is, I think, scheduled to finish 2018 (I think). Phase 1 will open sometime between Dec 2013-Feb 2014, and only makes it to the eastern portion of Reston (midway between current closest Orange Line station and the airport). There is a lot of talk about what is going to happen to the current airport bus from DC, the current Washington Flyer bus from Falls Church, etc. AFAIK - Fairfax county is running a bus to the airport from the last Silver Line stop. The Washington Flyer will pick up/drop off from that stop as well. The 5A (from DC) is being considered for elimination...
med2484 is offline