FlyerTalk Forums - View Single Post - Any plans to rebuild the UA concourse (C and D gates & UX terminal) at IAD / Dulles?
Old Jul 15, 2013, 12:41 pm
  #26  
drewguy
 
Join Date: May 2009
Location: Washington, DC
Programs: UA 1K 1MM, AA, DL
Posts: 7,418
Originally Posted by DCA writer
I wouldn't go that far. The renderings of a lovely new C/D concourse that taunt you when you exit the Aerotrain come, AFAICT, from the design MWAA hired Kohn Pedersen Fox to draw up. That's not enough detail to hand to a contractor, but at a minimum it ought to serve as a starting point for whatever "value engineering" you need before tackling the money situation.
Well, sure, but those concept drawings put a gleam in my eye, but nothing more. They were done in 2010 (or earlier).

I doubt there's significant debate on what facilities are needed and the general overall footprint (although perhaps they would make it extendable, or build only one wing at first).

It's a money issue, and despite it hanging out there for years there hasn't been any open talk of moving past the general concept/wish.
drewguy is offline