Originally Posted by
EasyRyder
Airbus is not compensating them for down time and EK is inspecting them every 100 cycles. Leading to a minimum 27 days or so on the ground. Not enough engineers to do the job with current fleet.
Is that 27 days grounded after every 100 cycles? That is very worrying.