Originally Posted by
Bralo20
All A330's (5x A330-300 & 2x A330-200) will have the new cabins at the end of this year. I think that the 5 A333's will be done before the summerseason while the remaining 2 A332's will get their upgrade at the end of the year, after passing the busy summer.
4 A333's will be completed before the inaugural flight to JFK on June 1st. A/C will fly to JFK (always), FIH, DLA and NSI (as much as possible) and other routes when possible.