Originally Posted by
sbm12
The ability to change routing has always existed in the CO system. No need to screw the 24 hour window just to get to that point.
I've changed routing a few times, normally to shorter routing, bypassing IAH to go to EWR directly etc.
it normally takes a phone call if a low level person doing it, but the supervisors can do it with no issue, this is normally at DFW so maybe it is a training matter, I am not sure