Originally Posted by
BKKLEE
AS NOTED BY ANOTHER OP, PUTTING A BANDAID ON A BLEEDER DOESN'T FIX THE PROBLEM AND THE ON-GOING CONSTRUCTION WORK AND STILL TO BE COMPLETED CONSTRUCTION WORK WILL ONLY CAUSE GUESTS ARRIVING AFTER THE "SO-CALLED" 01 APRIL OPENING TO BE DISTURBED
There is ongoing construction work (mainly the Skytrain bridge), but we have been completely undisturbed.
The public areas of the hotel are fully complete and functional.