Originally Posted by
Jumbodriver
I think theres going to be 3 trains when T5C opens. I guess that means there'll be an outbound and inbound track through T5B so all trains to T5A will be from one side.
It would make sense for it to operate the same as it does for T5B, in that departing pax leave on the 'outsides' and arriving pax on the 'insides'. Trains could then run straight through and then back again, as they effectively do with B now. The issue comes with C to B or B to C connections, unless they expect everyone to go to A and then back again.