Originally Posted by
Jet Clipper America
One of the things Slater mentioned was how glad he was that the a/c would be taken out of service as a result of the slide deployment. How long does it take for the slide to be replaced and the aircraft put back into service?
He would be "glad" that a flight would be delayed or canceled, and hundreds of passengers inconvenienced?
Absolutely this guy should get his job back.

Every day it seems this loser becomes a bigger douche.