Originally Posted by
raph
I thought it was a good move that BA announced flights to be cancelled longer than the airspace was closed (due to safety concerns and additional aircraft checks
Is this the same BA who sent a dozen flights towards the UK at a time when UK airspace was closed and wasn't going to open until the following day