FlyerTalk Forums - View Single Post - JFK terminal 6 will be rebuilding new international arrivals
Old Jun 9, 2009 | 6:08 am
  #31  
sbm12
A FlyerTalk Posting Legend
10 Countries Visited20 Countries Visited30 Countries Visited20 Years on Site
 
Join Date: Apr 2001
Location: PSM
Posts: 69,232
Originally Posted by vatraveler
If this is accurate, T1 --> T2 and T3 --> T4 connectors are planned for Summer 2010....

http://www.airliners.net/aviation-fo...n/4414014/1/#1
Big "if" there and there is the added issue of the logistics and loss of gate space for the existing carriers while the construction happens - particularly the loss of two gates at T4. They could do it but it is going to be a mess while that happens. And those renderings show an enclosed walkway/terminal connecting the buildings. I don't believe they've broken ground yet so the prospect of having something completed in 12-16 months (summer 2010) seems low.
sbm12 is offline