Wirelessly posted (BlackBerry8900/4.6.1.114 Profile/MIDP-2.0 Configuration/CLDC-1.1 VendorID/100)
On the upside, a crew was installing a new platform floor at ORD today -- some kind of stone composite covering the bare concrete that's been there a little while. Bye bye bumpys.