Amandari Update
Stayed at Amandari just as it closed -- we were the last to check out on Sunday, 26 October. Per Liv Gessing, and as previously noted, the renovation will not alter the look and feel of the place. Thatch on some of the roofs gets replaced (including the main building); toilets and plumbing fixtures replaced; wiring replaced (maybe some of the AC units, too?); new kitchen equipment; lots of little stuff, like worn door latches and closet switches.
Most of the staff not working directly on the renovation will be on extended leave; some will fill in at Amankila or Amanusa. She doesn't expect much turnover. About three months' work, all in............................