Originally Posted by
JC5280
I have a DEN-SAN-SFO that is booked as a connection, but it is showing on .bomb that I need 3 e500s for this.
When requesting the upgrades, .bomb calculates the number of certs required on a segment-by-segment basis, but will actually only pull the certs needed to satisfy the point-to-point distance if both clear in advance.