2) would be the early foundation stage of the new departure gates terminal which will be reached by the shuttle train (the tunnel is already built I understand).

The construction inside Terminal 1 at the immigration area is to reconfigure security checkpoint and the immigration booths. Basically the order will be switched .. go thru security first then immigration. Wonder if CX will plump for a fast track channel?? Highly doubt it