![]() |
Originally Posted by Flyer420
Now they have to improve B and C, and maybe D.
Before 9/11, the Port had plans for a whole new terminal building (including landside facilities) to be set way north of the north satellite. Now the plan will be to extend D incrementally as growth warrants. See this article. Growth currently doesn't warrant even thinking when they might start as there are plenty of empty gates in the new A extension. |
Seattle Times article today on SEA additions
Seattle Times article
Set to open officially in June, the $126 million terminal, called Pacific Marketplace, is pushed out from the back of the existing terminal with 11 new restaurants and nine new retail stores accessible to anyone flying out of Sea-Tac. It's the most-dramatic change to Sea-Tac since the airport was built in the 1940s. |
Expanding D increnetally to the Satellite and beyond? Wow. I hope they use moving sidewalks!
|
| All times are GMT -6. The time now is 11:15 pm. |
This site is owned, operated, and maintained by MH Sub I, LLC dba Internet Brands. Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Designated trademarks are the property of their respective owners.