Last edit by: starflyergold
Please note that special rules apply to this thread given some of the recent arguments in this thread. I would like to draw your attention to the FT Rules, in particular about personal attacks, off topic and disruptive posts and discussing moderator action. From now on every rules violation in this thread will lead to immediate suspensions of posting privileges, no further warnings will be issued. These might be temporary or permanent. Should this not calm the situation down the thread will be closed down permanently.
starflyergold
TK forum moderator
starflyergold
TK forum moderator
Istanbul New Airport
#782
FlyerTalk Evangelist
Join Date: Jan 2000
Posts: 15,345
It's about different bus costs to and from the airport to various places in and around Istanbul. You know, because there will be no train for several years, supposedly legally no ride sharing services, and only 600-700 taxis.
#783
Join Date: Feb 2018
Posts: 613
0. Line - Distance - Time - Price - Vehicle
1.Beylikdüzü Tüyap-52 km-15 dakika-21 TL-15 araç
2.Otogar-38 km-15 dakika-16 TL-12 araç
3.Bakırköy-44 km-10 dakika-18 TL-19 araç
4.Yenikapı-Sirkeci-50 km-11 dakika-18 TL-23 araç
5.Beşiktaş-43 km-20 dakika-18 TL-13 araç
6.Alibeyköy Cep Otogarı-31 km-30 dakika-16 TL-5 araç
7.Kadıköy-64 km-20 dakika-25 TL-11 araç
8.Pendik-93 km-45 dakika-30 TL-5 araç
9.Hacıosman-40 km-30 dakika-16 TL-4 araç
10.Tepeüstü-91 km-30 dakika-25 TL-7 araç
11.Arnavutköy-22 km-40 dakika-12 TL-3 araç
12.Kemerburgaz-21 km-40 dakika-12 TL-3 araç
13.Sarıyer-40 km-30 dakika-16 TL-5 araç
14.Başakşehir-27 km-30 dakika-14 TL-4 araç
15.Bahçeşehir-40 km-40 dakika-16 TL-4 araç
16.Mahmutbey Metro-36 km-45 dakika-15 TL-3 araç
17.Halkalı-40 km-50 dakika-16 TL-4 araç
18.Mecidiyeköy-37 km-15 dakika-16 TL-10 araç
= Minimum 2$, maximum 5$/ Person
Last edited by Sedat Guzel; Sep 2, 2018 at 3:11 am
#785
Join Date: Jun 2018
Programs: TK Elite
Posts: 246
0. Line - Distance - Time - Price - Vehicle
1.Beylikdüzü Tüyap-52 km-15 dakika-21 TL-15 araç
2.Otogar-38 km-15 dakika-16 TL-12 araç
3.Bakırköy-44 km-10 dakika-18 TL-19 araç
4.Yenikapı-Sirkeci-50 km-11 dakika-18 TL-23 araç
5.Beşiktaş-43 km-20 dakika-18 TL-13 araç
6.Alibeyköy Cep Otogarı-31 km-30 dakika-16 TL-5 araç
7.Kadıköy-64 km-20 dakika-25 TL-11 araç
8.Pendik-93 km-45 dakika-30 TL-5 araç
9.Hacıosman-40 km-30 dakika-16 TL-4 araç
10.Tepeüstü-91 km-30 dakika-25 TL-7 araç
11.Arnavutköy-22 km-40 dakika-12 TL-3 araç
12.Kemerburgaz-21 km-40 dakika-12 TL-3 araç
13.Sarıyer-40 km-30 dakika-16 TL-5 araç
14.Başakşehir-27 km-30 dakika-14 TL-4 araç
15.Bahçeşehir-40 km-40 dakika-16 TL-4 araç
16.Mahmutbey Metro-36 km-45 dakika-15 TL-3 araç
17.Halkalı-40 km-50 dakika-16 TL-4 araç
18.Mecidiyeköy-37 km-15 dakika-16 TL-10 araç
1.Beylikdüzü Tüyap-52 km-15 dakika-21 TL-15 araç
2.Otogar-38 km-15 dakika-16 TL-12 araç
3.Bakırköy-44 km-10 dakika-18 TL-19 araç
4.Yenikapı-Sirkeci-50 km-11 dakika-18 TL-23 araç
5.Beşiktaş-43 km-20 dakika-18 TL-13 araç
6.Alibeyköy Cep Otogarı-31 km-30 dakika-16 TL-5 araç
7.Kadıköy-64 km-20 dakika-25 TL-11 araç
8.Pendik-93 km-45 dakika-30 TL-5 araç
9.Hacıosman-40 km-30 dakika-16 TL-4 araç
10.Tepeüstü-91 km-30 dakika-25 TL-7 araç
11.Arnavutköy-22 km-40 dakika-12 TL-3 araç
12.Kemerburgaz-21 km-40 dakika-12 TL-3 araç
13.Sarıyer-40 km-30 dakika-16 TL-5 araç
14.Başakşehir-27 km-30 dakika-14 TL-4 araç
15.Bahçeşehir-40 km-40 dakika-16 TL-4 araç
16.Mahmutbey Metro-36 km-45 dakika-15 TL-3 araç
17.Halkalı-40 km-50 dakika-16 TL-4 araç
18.Mecidiyeköy-37 km-15 dakika-16 TL-10 araç
Children aged 6 or under are not charged for tickets on this line.
#786
FlyerTalk Evangelist
Join Date: Aug 2010
Location: CPH
Programs: UAMP S, TK M&S E (*G), Marriott LTP, IHG P, SK EBG
Posts: 11,075
The first stop will be opened on October 29 Istanbul New Airport will be operated on 150 buses on 18 routes. The most expensive and the farthest line will be Pendik with 30 TL, and the Yenishapi-Sirkeci line will be charged for 18 TL for the line that most vehicles will travel. The other lines will be Beylikdüzü Tüyap, Otogar, Bakırköy, Beşiktaş, Alibeyköy Mobile Bus Station, Kadıköy, Hacıosman, Tepeüstü, Arnavutköy, Kemerburgaz, Sarıyer, Başakşehir, Bahçeşehir, Mahmutbey Metro, Halkalı and Mecidiyeköy lines. Bus lines will take place every 10 minutes......
Subway lines to be opened by the end of 2019
The metron between Gayrettepe-Istanbul New Airport is at the end of 2019; The metron between Halkalı-Istanbul New Airport, which has 6 stations with 27 kilometers, is expected to be opened at the end of 2020.
Subway lines to be opened by the end of 2019
The metron between Gayrettepe-Istanbul New Airport is at the end of 2019; The metron between Halkalı-Istanbul New Airport, which has 6 stations with 27 kilometers, is expected to be opened at the end of 2020.
#788
#791
FlyerTalk Evangelist
Join Date: Jan 2000
Posts: 15,345
As has been referred to on this very thread several times, those metro dates are simply impossible as much of what is needed (like tunnels and stations) does not even exist yet, i.e. the first shovels have not even been removed yet, so unless they are going to build and tunnel at a rate something like 3x faster than has ever been done anywhere on Earth, meaning that they would need machines which work faster than those which exist, these time scales are simply not correct.
#792
Join Date: May 2000
Location: HFA
Posts: 1,712
There's always SAW...
The new airport will probably only be good for connections in the first few years.
Shuly
The new airport will probably only be good for connections in the first few years.
Shuly
#793
FlyerTalk Evangelist
Join Date: Aug 2010
Location: CPH
Programs: UAMP S, TK M&S E (*G), Marriott LTP, IHG P, SK EBG
Posts: 11,075
As has been referred to on this very thread several times, those metro dates are simply impossible as much of what is needed (like tunnels and stations) does not even exist yet, i.e. the first shovels have not even been removed yet, so unless they are going to build and tunnel at a rate something like 3x faster than has ever been done anywhere on Earth, meaning that they would need machines which work faster than those which exist, these time scales are simply not correct.
#795
Join Date: Sep 2014
Location: Brexile in ADB
Programs: BA, TK, HHonours, Le Club, Best Western Rewards
Posts: 7,067
I assume the actual distribution system will be pipes to each aircraft stand and mobile pumps will be used and not tankers?