Last edit by: starflyergold
Please note that special rules apply to this thread given some of the recent arguments in this thread. I would like to draw your attention to the FT Rules, in particular about personal attacks, off topic and disruptive posts and discussing moderator action. From now on every rules violation in this thread will lead to immediate suspensions of posting privileges, no further warnings will be issued. These might be temporary or permanent. Should this not calm the situation down the thread will be closed down permanently.
starflyergold
TK forum moderator
starflyergold
TK forum moderator
Istanbul New Airport
#496
FlyerTalk Evangelist
Join Date: Aug 2000
Location: London
Programs: Hilton, IHG - BA, GA, LH, QR, SV, TK
Posts: 17,008
#497
#498
Join Date: Feb 2018
Posts: 46
Also, are TK not building any such facilities in the western airfield to the south of the main ATC tower which the airport has previously described as the "cargo and maintenance" area? That would surprise me somewhat.
#507
Join Date: May 2018
Posts: 31
A small aircraft hangar and a cargo center (for belly cargo?) likely to be operational before the scheduled end-October opening date
Last edited by Ray Ube; Jul 11, 2018 at 9:53 pm
#508
Join Date: May 2018
Posts: 31
The heart of an airport terminal is arguably its baggage system. The baggage system of INA was fully installed in the second week of December 2017 (except arrival carousels & departure check-in counters which were completed at later dates). It has since underwent extensive testings and shall continue to be tested (for a total 10-month period). Hence the whole baggage system is likely to be ready for commissioning before the scheduled end-October 2018 opening date.
Last edited by Ray Ube; Jul 11, 2018 at 10:04 pm
#509
Join Date: May 2018
Posts: 31
8 December 2017
The INA's 42-km luggage system has been completed in a record time of 24 months (from December 2015 to December 2017).
#510
Join Date: May 2018
Posts: 31
I think INA shall commence operations in end-October 2018 with Gates B, C, E, F and G (domestic) while Gates A and D will open around 6 months later (in time for the peak summer travel season).