September 1st, 2003: Zurich Terminal "E"
#1
Original Poster
Join Date: Aug 2000
Location: ZRH / YUL
Programs: UA, TK, Starwood > Marriott, Hilton, Accor
Posts: 7,294
September 1st, 2003: Zurich Terminal "E"
According to a press release by unique, the managing company of ZRH airport, the new Dock Midfield or Terminal E will be opened on September 1st. At the same time, airport fees will be risen to CHF36 for every passenger with ZRH as destination and CHF20 for transit passengers.
German press release
------------------
airOli, the Swiss Air Line.
German press release
------------------
airOli, the Swiss Air Line.