WN: BOS terminal change in 2019 to Terminal B, Pier A
#1
Original Poster
Join Date: Apr 2003
Location: SEA, NW/DL 1.6Million Miler
Programs: DL 1MM Annual Silver,AS 100K 22-24, AS 75K 15-21
Posts: 4,278
WN: BOS terminal change in 2019 to Terminal B, Pier A
http://www.massport.com/media/2704/0..._watermark.pdf
Mostly due to support DL and B6 route expansion and additional of terminal connector between B and C, looks like Southwest will move again, this time to Terminal B, Pier A, gates B32, B32A, B33, B34 and B35 in June 2019. See page 125.
Jiburi
Mostly due to support DL and B6 route expansion and additional of terminal connector between B and C, looks like Southwest will move again, this time to Terminal B, Pier A, gates B32, B32A, B33, B34 and B35 in June 2019. See page 125.
Jiburi