First stations on new Thomson-East Coast Line expected to open in January 2020
#1
Original Poster
Join Date: Dec 2012
Posts: 1,675
First stations on new Thomson-East Coast Line expected to open in January 2020
Link to story: First 3 stations on Thomson-East Coast Line to open by end-January
Starting in January and ending in 2024, the TEL will open in stages with a bunch taking place every year up to 2024 (and one additional station announced this year, opening in 2025).
Ultimately it is expected to make it all the way to Changi, but this extension is only currently slated to be completed "before 2040" though there is supposed to be a station ready for Changi T5.
These stations (the first stage) will be in the north of Singapore:
Woodlands North
Woodlands
Woodlands South
Stage 2 expected to be complete by 2020
Springleaf
Lentor
Mayflower
Bright Hill
Upper Thomson
Caldecott
Stage 3 expected to be complete by 2021
Mount Pleasant
Stevens
Napier
Orchard Boulevard
Orchard
Great World
Havelock
Outram
Maxwell
Shenton Way
Marina Bay
Marina South
Gardens by the Bay
Additional station expected to be complete by 2025
Founders' Memorial
Stage 4 expected to be complete by 2023
Tanjong Rhu
Katong Park
Tanjong Katong
Marine Parade
Marine Terrace
Siglap
Bayshore
Stage 5 expected to be complete by 2024
Bedok South
Sungei Bedok
Thomson-East Coast Line Extension to be ready by 2040 (not confirmed)
Changi Airport Terminal 5
Changi Airport
Expo
Tanah Merah
Starting in January and ending in 2024, the TEL will open in stages with a bunch taking place every year up to 2024 (and one additional station announced this year, opening in 2025).
Ultimately it is expected to make it all the way to Changi, but this extension is only currently slated to be completed "before 2040" though there is supposed to be a station ready for Changi T5.
These stations (the first stage) will be in the north of Singapore:
Woodlands North
Woodlands
Woodlands South
Stage 2 expected to be complete by 2020
Springleaf
Lentor
Mayflower
Bright Hill
Upper Thomson
Caldecott
Stage 3 expected to be complete by 2021
Mount Pleasant
Stevens
Napier
Orchard Boulevard
Orchard
Great World
Havelock
Outram
Maxwell
Shenton Way
Marina Bay
Marina South
Gardens by the Bay
Additional station expected to be complete by 2025
Founders' Memorial
Stage 4 expected to be complete by 2023
Tanjong Rhu
Katong Park
Tanjong Katong
Marine Parade
Marine Terrace
Siglap
Bayshore
Stage 5 expected to be complete by 2024
Bedok South
Sungei Bedok
Thomson-East Coast Line Extension to be ready by 2040 (not confirmed)
Changi Airport Terminal 5
Changi Airport
Expo
Tanah Merah