FlyerTalk Forums

FlyerTalk Forums (https://www.flyertalk.com/forum/index.php)
-   Other European Airlines (https://www.flyertalk.com/forum/other-european-airlines-469/)
-   -   TUI netherlands delay claim (https://www.flyertalk.com/forum/other-european-airlines/1994247-tui-netherlands-delay-claim.html)

cass88 Dec 5, 19 8:46 am

Thanks for the detail information. I have checked the booking info I got from TUI, there was listed the arrival was 16:30. But in the separate fly ticket or boarding pass, there was no arrival time.

UKtravelbear Dec 5, 19 9:48 am

then that is the time that matters and that is used in calculating the difference between scheduled and actual time arrival.

Fabo.sk Dec 9, 19 4:39 pm

Damn. 2:59.That sucks


All times are GMT -6. The time now is 10:56 am.


This site is owned, operated, and maintained by MH Sub I, LLC dba Internet Brands. Copyright 2018 MH Sub I, LLC dba Internet Brands. All rights reserved. Designated trademarks are the property of their respective owners.