CDG Aerogare 2E
Does anybody know if Satelite 2E is completed? If they ever stop going on strike http://www.flyertalk.com/airports/ft...orum/smile.gif then it will be fun to fly through there, merci. ------------------ PA747-May it rest in Peace |
Aérogare 2E will be opening on June 17th although only a third or so of the terminal will be opened. The entire terminal should be ready by 2005/2006. It is going to operated by Air France/Skyteam long-haul flights only.
|
|
Was through CDG at the end of June. 2E is still in the construction phase - lots of plastic sheeting and interior construction underway.
|