N830MH Feb 2, 2025 4:31 pm

Construction at DWC?
 
Hi all,

I haven't heard anything going on at new DWC airport. They haven't started construction yet. If possible, please merge the thread.

Please posts a construction video and pictures, too.

Mwenenzi Feb 2, 2025 4:44 pm

Google is your freind
https://en.wikipedia.org/wiki/Al_Mak...tional_Airport

Al Maktoum International Airport (IATA: DWC, ICAO: OMDW), also known as Dubai World Central,[3] is an international airport in Jebel Ali, 37 kilometres (23 mi) southwest of[2] Dubai, United Arab Emirates, that opened on 27 June 2010.[1] It is the main part of Dubai South, a planned residential, commercial and logistics complex.

When fully completed (originally expected 2027, now in 2030[4]), the airport will contain transport modes, logistics, and value-added services, including manufacturing and assembly, in a single free economic zone.[5][clarification needed] It will cover an area of 36,000 acres (14,400 ha). The airport has a projected annual capacity of 12 million tonnes (12,000,000 long tons; 13,000,000 short tons) of freight and between 160 million[6] and 260 million passengers.[7] As of 2021, only a handful of airlines operated passenger services out of Al Maktoum International Airport with a focus on freight activity.

IntrepidAfrican2 Feb 2, 2025 9:23 pm


Originally Posted by N830MH (Post 36864710)
Hi all,

I haven't heard anything going on at new DWC airport. They haven't started construction yet. If possible, please merge the thread.

Please posts a construction video and pictures, too.

Last I heard they are in the “detailed design” phase. Unclear precisely what the Ruler approved, but there you go. I also chatted with a former CF colleague last year who said financing wasn’t quite tied up. 2033 is the estimate.

N830MH Feb 7, 2025 3:42 pm


Originally Posted by IntrepidAfrican2 (Post 36865241)
Last I heard they are in the “detailed design” phase. Unclear precisely what the Ruler approved, but there you go. I also chatted with a former CF colleague last year who said financing wasn’t quite tied up. 2033 is the estimate.

Right, but they haven't even starting construction yet. So yes, I already know Dubai Ruler has already approved by last year. I am sure they will starts construction soon enough. Please keep us updated as you can.

LXA350 Feb 15, 2025 4:38 am

Looking at how often other projects are delayed, I doubt we will see DXB operations to be replaced before 2035 and then likely in phases. At first step I would see the non EK group airlines currently operated out of T1 to be transfered to their dedicated Terminal space and only later; weeks, months or even 1-2 years after the EK group which will be a big challenge but likely can be done over 1-2 days. Likely most operation can be transfered over in one go having all arrivals / departures after the night / morning wave land and depart at the new airport etc.