![]() |
Emirates To Ground Planes During Runway Work In May
Late spring runway construction at DXB will result in Emirates' grounding of 19-20 planes or about 10% of its fleet.
http://gulfbusiness.com/2014/02/duba...nway-work-may/ |
Quote:
|
Quote:
|
I assume that this has been planned for and that schedules were adjusted well in advance.
If anything, the availability of so many more replacement aircraft might mean fewer last minute cancellations. |
The leaked letter discussing this early last year reckoned Emirates and flydubai would drop around 22% of their combined operations.
I know this will not equate 1:1 to aircraft, but to only have 10% out of service sounds quite good for EK. |
Quote:
One should think again |
Glasgow/Dubai is being reduced from twice to once daily, but the interesting thing is the usual 777 service will be replaced by an A380 ! First time for a Scottish airport, one for the plane spotters amongst us :)
http://www.thenational.ae/uae/touris...bai-to-glasgow |
Quote:
|
Now does the grounding of 19-20 aircraft include the wing fix of 4 SJ. If yes then we're really looking at 15-16 aircraft actually being grounded.
|
Quote:
|
Quote:
The day of the A380 flight also has the evening service as normal. Quote:
|
Have EK flights booked for 2 DXB/HKG for 23rd May any change there?.
|
Quote:
|
Quote:
|
so at this point is it safe to say all the schedules on EK's website already reflect the cancellations?
|
| All times are GMT -6. The time now is 5:00 pm. |
This site is owned, operated, and maintained by MH Sub I, LLC dba Internet Brands. Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Designated trademarks are the property of their respective owners.