FlyerTalk Forums

FlyerTalk Forums (https://www.flyertalk.com/forum/index.php)
-   EL AL | Matmid (https://www.flyertalk.com/forum/el-al-matmid-610/)
-   -   EL AL Engineers to launch work slowdown (https://www.flyertalk.com/forum/el-al-matmid/1492555-el-al-engineers-launch-work-slowdown.html)

ELY001 Aug 9, 2013 2:18 am

EL AL Engineers to launch work slowdown
 
The EL AL Engineers Union is launching a work slowdown demanding that they get a collective agreement that is separate from other airline workers. The article can be found here: http://www.haaretz.com/business/1.540563

For an airline that has less than 40 a/c, EL AL seems to be having a lot of tech issues with it's a/c. Perhaps disgruntled engineers may be one of the reasons for this? I sure hope that is not the case, but if it is, given how the company has been performing lately, it wouldn't surprise me.


All times are GMT -6. The time now is 12:25 pm.


This site is owned, operated, and maintained by MH Sub I, LLC dba Internet Brands. Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Designated trademarks are the property of their respective owners.