FlyerTalk Forums

FlyerTalk Forums (https://www.flyertalk.com/forum/index.php)
-   Delta Air Lines | SkyMiles (https://www.flyertalk.com/forum/delta-air-lines-skymiles-665/)
-   -   ATL Masterplan 2021 (https://www.flyertalk.com/forum/delta-air-lines-skymiles/1606965-atl-masterplan-2021-a.html)

N830MH Aug 28, 2014 9:08 pm

ATL Masterplan 2021
 
Hi All,

There is proposed for Atlanta Jackson International Airport. They will built more new parking garage in the domestic terminal, the entire concourse T, A, B, C, D will be remodernization, the entire concourse E into the domestic gates, and also, they will built east of Maynard Jackson int. terminal, and proposed new sixth runway, as well. Delta cargo will be relocate, too. They will move to south side of Atlanta Jackson International Airport near sixth runway.

Looks like preliminary ATL master plan out there

http://www.aviationpros.com/news/116...cks-6th-runway

http://www.bizjournals.com/atlanta/b...=image_gallery.

Let the speculation begin.

readywhenyouare Aug 28, 2014 9:14 pm

I vote that they put a Coke Freestyle machine at every gate. I can't think of a better way to modernize the airport and represent the city of Atlanta at the same time. ;)

N639DL Aug 28, 2014 9:22 pm

Adding "Concourse G, H, and I"

Hopefully that'll be south of rwy 9R/north of rwy 10 as it would be a major hassle to DL and others to destroy the maintenance facility and everything else that's east of concourse F.

N830MH Aug 28, 2014 9:39 pm


Originally Posted by N639DL (Post 23441637)
Adding "Concourse G, H, and I"

Is going to be new concourse G, H & I? I think planetrain will have extend the lines to concourse H or I.

StayingHomeIsBetter Aug 28, 2014 9:39 pm

I was hoping that the master plan was to move ATL to some location with better weather. :D

WhiskeyBravo Aug 29, 2014 2:38 am

Wow. That will truly be a monster. I agree with StayingHomeIsBetter, I thought this plan would include building a giant climate control device around the airport ;)

JM

TurfGuy Aug 29, 2014 5:35 am

They've had plans for the 6th runway for a long time. Back before the recession and when regionals were really big, the plan was to add another runway and regional terminal out between the 5th & 6th runway for that traffic.

jrkmsp Aug 29, 2014 6:32 am


Originally Posted by N639DL (Post 23441637)
Adding "Concourse G, H, and I"

Hopefully that'll be south of rwy 9R/north of rwy 10 as it would be a major hassle to DL and others to destroy the maintenance facility and everything else that's east of concourse F.

They're basically half concourses, as with F. Rather than run in both directions from the plane train, they only go away from where TechOPS is.

mmichael453 Aug 29, 2014 10:11 am

The biggest thing this is missing: non-sterile people mover connectivity between the Intl terminal the rental car facility and MARTA rail. The south end-around taxiway will be a welcome addition.

18sas Aug 29, 2014 10:21 am

I can't tell if the plan includes the long-proposed South Gate Complex in addition to GHI concourses. Or are those gates at the South end of the map just new cargo facilities?

Throw Down Your Leavy Screens Aug 29, 2014 10:28 am


Originally Posted by 18sas (Post 23444066)
I can't tell if the plan includes the long-proposed South Gate Complex in addition to GHI concourses. Or are those gates at the South end of the map just new cargo facilities?

The article indicated that the South Gate Complex would be abandoned for construction of G-H-I:
The airport's last master plan envisioned a separate new terminal/gate complex south of the main terminal, but the new one drops that idea in favor of new concourses to the east of the existing ones. That maintains the airport's efficient design and enables easier connection to the Plane Train, airport managers said.

SJC ORD LDR Aug 29, 2014 10:46 am

I'm just shocked that someone thinks that ATL needs three new concourses.

I would like to see some money for moving sidewalks along the concourses. Having to connect from B1 to B36 is a royal pain.

cdubose98 Aug 29, 2014 10:46 am


Originally Posted by 18sas (Post 23444066)
I can't tell if the plan includes the long-proposed South Gate Complex in addition to GHI concourses. Or are those gates at the South end of the map just new cargo facilities?

I believe those "gates" are all for cargo.

What I haven't seen answered is whether the new concourses will be designed for international use. I would think so, since apparently E will be converted to domestic and F is nowhere near big enough to handle the peak hours by itself.

HDQDD Aug 29, 2014 11:00 am


Originally Posted by StayingHomeIsBetter (Post 23441703)
I was hoping that the master plan was to move ATL to some location with better weather. :D

That's debatable. ATL's weather is great in the winter! DTW/MSP, not so much.

18sas Aug 29, 2014 11:16 am


Originally Posted by ThrowDownYourLeavyScreens (Post 23444103)
The article indicated that the South Gate Complex would be abandoned for construction of G-H-I:
The airport's last master plan envisioned a separate new terminal/gate complex south of the main terminal, but the new one drops that idea in favor of new concourses to the east of the existing ones. That maintains the airport's efficient design and enables easier connection to the Plane Train, airport managers said.

Ah, thank you. I skipped right over that paragraph. GHI is a better alternative. I believe that all the non-DL airlines were not very happy about the South Gate Complex proposal, since the plan was essentially to move everyone but DL there.


All times are GMT -6. The time now is 5:55 am.


This site is owned, operated, and maintained by MH Sub I, LLC dba Internet Brands. Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Designated trademarks are the property of their respective owners.